Thunderbolt 110 colorful universal waterproof coating is a high-quality environmentally friendly emulsion as the base material, to high quality Portland white cement, inorganic mineral material grade with aggregate by scientific ratio modulation of a two-component waterproof coating, the product has good waterproof, alkali resistance and bonding performance, widely used in indoor toilets, kitchen, balcony and other locations of the waterproof treatment
|
Characteristic one
|
Low VOC, low odor, safety and environmental protection
|
Characteristic II
|
Beautiful color, avoid leakage brush
|
|
Characteristic three
|
Strong adhesion, tiling worry-free
|
Characteristic four
|
Smooth roll coating, efficient construction
|
bathroom, kitchen, balcony
Basement side wall
Indoor back water waterproof moisture-proof
【Base Layer Preparation】
Base Layer Inspection: The wall base must be solid, free of oil stains, floating dust, and other loose substances. For large holes or cracks, repair them first using mortar or leak-sealing products. For aluminum formwork concrete bases, it is recommended to treat the surface with an interface agent first.
Base Layer Moistening: Fully moisten the base with clean water. Construction can only begin when there is no visible water remaining on the base surface.
【Coating Preparation】
First, pour the liquid component into a clean empty bucket. Start stirring, then slowly add the powder component in the recommended ratio. Continue stirring while adding the powder until a uniform slurry is formed in the bucket. Mechanical stirring is mandatory to achieve optimal mixing results. After thorough stirring, let the slurry stand for maturation for approximately 3-5 minutes, then stir again for about 30 seconds before use.
【Waterproof Construction】
It is recommended to use a medium-bristle or long-bristle roller for application (a brush may be used for joint treatment). Apply the coating in thin, multiple layers as much as possible. The direction of the second coat should be perpendicular to the first. Each subsequent coat must be applied only after the previous waterproof layer has dried on the surface (typically 2-6 hours), until the required thickness is achieved.
Apply two or more coats of the waterproof layer. The total thickness of the waterproof layer must be at least 1.5mm, and the thickness of each individual coat must not exceed 1mm to facilitate proper curing.
After construction is completed, conduct a comprehensive inspection of the entire surface. Promptly address any areas where the coating was missed.
Once the coating film is completely dry, a water-tightness test can be performed.
【Recommended Dosage】
When the coating film thickness is 1.0mm, the theoretical dosage is approximately 2.1±0.2kg/m² (the actual dosage may vary depending on the flatness of the base layer).
should be at a temperature of 5 ℃ ~ 35 ℃, air relative humidity ≤ 85% under the conditions of construction; low temperature or high humidity environment, can be appropriate to extend the subsequent construction time, high temperature climate should pay attention to ensure that the base is wet enough
Before the product is used, the mixing equipment should be prepared, and manual mixing is strictly prohibited.
The stirred slurry should be used up within 1 hour, and the solidified material should not be reused
with water. Waterproof construction should adhere to the principle of first node treatment and then large surface, should first deal with the root, yin and yang angle position of the node
It is recommended to support our brand tile glue for paving construction
In the basement and air circulation places, please try to avoid high humidity and air temperature for construction, fan auxiliary ventilation can be used