Current Location:Home > Products > Grout
Return to List
Xunlei 210 Colorful High Soft Waterproof Coating
Main features
  • Beautiful color coating, effectively avoid leakage coating
  • Good leveling and effortless brushing
  • Super water resistance, alkali resistance
  • Good adhesion, can be firmly attached to the base surface
  • Excellent impermeability and impermeability
  • Can be directly constructed on the wet base surface without open water
  • green environmental protection
Product Certification
Color
  • Green
Product Specifications
  • 18kg per Bucket
Executive standards
  • GB/T23445-2009 Polymer-Cement Waterproof Coatings, Type Ⅲ
Product overview

Thunderbolt 210 colorful high soft waterproof coating is a high-quality acrylic emulsion as the base material, to high quality Portland white cement, inorganic mineral material grade with aggregate by scientific ratio modulation of a two-component waterproof coating, product flexibility is good, waterproof performance is excellent, suitable for a variety of indoor and outdoor waterproof moisture-proof treatment

Product characteristics
Characteristic one
Low VOC, safety and environmental protection
Characteristic II
Dense coating, strong impermeability
Characteristic three
Alkali and water resistance, lasting care
Characteristic four
Good flexibility, adapt to the grass-roots stress
Scope of application

bathroom, kitchen, balcony and other indoor waterproof
Basement side wall
Waterproof and moisture-proof
of indoor and basement back water surface

Construction operation

【On-Site Preparation for Base Layer】

Base Layer Inspection: The wall base layer shall be solid, free of oil stains, floating dust, and other loose materials. For large holes and cracks, repair them first with mortar or leak-sealing products. For aluminum formwork concrete base layers, it is recommended to treat the surface with an interface agent first.
Base Layer Moistening: Fully moisten the base layer with clean water. Construction can only start when there is no visible standing water on the base surface.

【Coating Preparation】

First, pour the liquid component into a clean empty bucket. Start stirring, then slowly add the powder component in the recommended proportion. Continue stirring while adding the powder until a uniform slurry is formed in the bucket (mechanical stirring must be used to achieve the best mixing effect). After thorough stirring, let the slurry stand for curing for approximately 3–5 minutes, then stir again for about 30 seconds before use.

【Waterproof Construction】

It is recommended to use a medium-bristle or long-bristle roller for construction (a brush can be used for joint treatment). Apply the coating in thin layers for multiple passes as much as possible, and the direction of the second pass shall be perpendicular to the first pass. Each pass of construction must be carried out after the previous waterproof layer has dried on the surface (approximately 2–6 hours) until the required thickness is reached.
For waterproof construction with two or more passes, the total thickness of the waterproof layer must be at least 1.5mm, and the thickness of each single pass shall not exceed 1mm to facilitate curing.
After construction, conduct an overall inspection of the entire surface and promptly repair any missed coating areas.
After the coating film is completely dry, water-tightness acceptance testing can be carried out.

【Recommended Dosage】

When the thickness of the coating film is 1.0mm, the theoretical dosage is approximately 1.8±0.1kg/m² (specific values may vary depending on the flatness of the base layer).

Precautions

should be at a temperature of 5 ℃ ~ 35 ℃, air relative humidity ≤ 85% under the conditions of construction; low temperature or high humidity environment, can be appropriate to extend the subsequent construction time, high temperature climate should pay attention to ensure that the base is wet enough
Before the product is used, the mixing equipment should be prepared, and manual mixing is strictly prohibited.
The stirred slurry should be used up within 1 hour, and the solidified material should not be reused
with water. Waterproof construction should adhere to the principle of first node treatment and then large surface, should first deal with the root, yin and yang angle position of the node
It is recommended to support our brand tile glue for paving construction
In the basement and air circulation places, please try to avoid high humidity and air temperature for construction, fan auxiliary ventilation
can be used

Transportation and storage
  • Storage conditions
    The product should be stored in a cool and ventilated place, no exposure, rain
  • Transportation requirements
    During transportation, prevent rain, sun exposure, cold, squeeze and collision, and keep the package intact.
  • Warranty Period
    From the date of production, the shelf life of the product is 12 months at a storage temperature of 5-35°C.
FAQ
Q
The coating may stratify, precipitate or form a skin on the surface after storage
A
The storage temperature is too high, the seal is not tight, or it has been left for a long time without stirring.
Solution Store as required by the instruction manual (such as away from light and in an environment of 5 to 35℃);
Q
The coating does not cure for a long time after application
A
1. Incorrect two-component ratio;
2. Low-temperature or high-humidity environment;
Solution: Mix strictly in proportion and use an electric mixer.
2. The ambient temperature should be between 5 and 35 degrees Celsius, and ventilation should be enhanced.
Q
Cracks appear in the coating or it detaches from the base layer
A
The base layer has not been cleaned (with loose dust and oil stains).
2. Applying too thick a single coat;
3. The material is incompatible with the base layer.
Solution: 1. Clean the base layer and moisten it (without standing water);
2. Apply thin coats multiple times (0.5 to 1mm per layer);
3. The corners are rounded and the reinforcing material 249 is added.
Q
There are fine holes or bulges on the surface of the coating
A
1. The base layer contains pores, and gas escapes during painting.
2. Exposure to high temperatures or excessive application.
Solution: 1. Moisten the base layer to saturation before construction;
2. Adopt a thin-coating process and avoid construction under direct sunlight.
3. Remove the bulging part and then repair it.
Q
The coating sags on the vertical surface, resulting in uneven thickness
A
Applying too thickly at one time or using improper construction methods.
Solution: Apply in three coats up to 1.5mm, crossing the horizontal and vertical directions.
2. Use a toothed scraper to control the thickness.
Q
Leakage occurs during the water-tightness test or after use
A
1. The coating has missed areas and pinholes.
2. The cracks in the base layer have not been treated or the quality of the materials is poor.
Solution: Repair the defective areas, reapply the paint and conduct a water-tightness test.
2. Additional layers should be added to important parts (such as the root of the pipe).
Q
The surface of the coating is white, discolored or uneven in color
A
1. Construction in damp environments (whitening);
2. Ultraviolet radiation or chemical erosion (discoloration).
3. Improper proportioning of two-component products (uneven color) Solution: 1. Select anti-whitening coatings and ensure the base layer is dry;
2. Weather-resistant coatings should be selected for outdoor use (coatings that can be used exposed).
Q
Paints release harmful gases (such as VOCs)
A
Using inferior or non-environmentally friendly materials.
Solution: 1. Choose low-VOC and non-toxic products (such as polymer cement-based coatings);
2. Ensure good ventilation during construction and wait until it has cured before moving in.
Preventive measures: 1. Base treatment: Ensure it is solid, flat, and free of oil stains. Base surfaces with high water absorption rates need to be moistened.
2. Material Selection: For damp substrates, choose coatings with strong adhesion (such as cement-based permeable crystalline type).
High-elasticity coatings (such as polyurethane) should be used for high-deformation areas.
3. Environmental Control: Avoid construction on rainy days, in winds of force 5 or above, or in extreme temperatures.
4. Process Specifications: The total thickness of the coating is ≥1.2mm (for organic coatings) or ≥3.0mm (for cement-based coatings).
The joint width should be no less than 100mm to avoid any missed coating.
Special Scene Precautions:
1. Basement project: Reactive coatings are recommended for the water-facing side, while cement-based coatings are suitable for the water-facing side.
2. Winter construction: Prefer reactive coatings to avoid the problem of low-temperature curing.
3. Renovation of old layers: Thoroughly remove the original coating and, if necessary, use an interface agent to enhance adhesion.
By standardizing material selection, strict construction and post-construction maintenance, the occurrence of problems with waterproof coatings can be significantly reduced. If the problem has already occurred, it should be repaired in a targeted manner based on the specific cause, and priority should be given to checking the compatibility of the grassroots level and materials.

WeChat

WeChat Channels

TikTok