Raytheon full-color super soft waterproof coating is a high-quality acrylic emulsion as the base material, to high quality Portland white cement, inorganic mineral material grade with aggregate by scientific ratio modulation of a two-component waterproof coating, product flexibility is good, waterproof performance is excellent, suitable for a variety of indoor and outdoor waterproof moisture-proof treatment
|
Characteristic one
|
Low VOC, safety and environmental protection
|
Characteristic II
|
Dense coating, strong impermeability
|
|
Characteristic three
|
Alkali and water resistance, lasting care
|
Characteristic four
|
Good flexibility, adapt to the grass-roots stress
|
bathroom, kitchen, balcony and other indoor waterproof
Basement side wall
Waterproof and moisture-proof of indoor and basement back water surface
1. Base Layer Preparation
Base Layer Inspection: The wall base must be solid, free of oil stains, floating dust, and other loose materials. For large holes and cracks, repair them first with mortar or leak-sealing products. It is recommended to treat aluminum formwork concrete bases with an interface agent first.
Base Layer Moistening: Fully moisten the base with clean water. Construction can only start when there is no visible water on the base surface.
2. Coating Preparation
First, pour the liquid component into a clean empty bucket, start stirring, and slowly add the powder component in the recommended proportion. Keep stirring while adding the powder until a uniform slurry is formed in the bucket. Mechanical stirring is mandatory to achieve the best mixing effect. After stirring evenly, let the slurry stand for maturation for about 3-5 minutes, then stir again for approximately 30 seconds before use.
3. Waterproof Construction
It is recommended to use a medium-bristle or long-bristle roller for construction (a brush can be used for joint treatment). Construction should be carried out with thin coats applied multiple times. The application direction of the second coat should be perpendicular to that of the first. Each coat must be applied only after the previous waterproof layer has dried on the surface (about 2-6 hours), until the required thickness is reached.
Apply two or more coats of the waterproof layer. The total thickness of the waterproof layer must be more than 1.5mm, and the thickness of each individual coat shall not exceed 1mm to facilitate curing.
After construction, conduct a comprehensive inspection of the entire surface and promptly address any missed coating areas.
Once the coating film is completely dry, a water-tightness test can be performed.
4. Recommended Dosage
When the coating film thickness is 1.0mm, the theoretical dosage is approximately 1.8±0.1kg/m² (the specific dosage varies depending on the flatness of the base layer).
should be at a temperature of 5 ℃ ~ 35 ℃, air relative humidity ≤ 85% under the conditions of construction; low temperature or high humidity environment, can be appropriate to extend the subsequent construction time, high temperature climate should pay attention to ensure that the base is wet enough
Before the product is used, the mixing equipment should be prepared, and manual mixing is strictly prohibited.
The stirred slurry should be used up within 1 hour, and the solidified material should not be reused
with water. Waterproof construction should adhere to the principle of first node treatment and then large surface, should first deal with the root, yin and yang angle position of the node
It is recommended to support our brand tile glue for paving construction
In the basement and air circulation places, please try to avoid high humidity and air temperature for construction, available fan auxiliary ventilation